Maasvlakte Power Plant
Project:
Maasvlakte Power Plant (MPP3), The Netherlands
Construction period:
2008-2009
Client:
E.ON Kraftwerke GmbH
Consultant:
E.ON Engineering GmbH
Contractor:
Haverkort Voormolen BV
Products used:
HRC T-headed bars
Project:
Maasvlakte Power Plant (MPP3), The Netherlands
Construction period:
2008-2009
Client:
E.ON Kraftwerke GmbH
Consultant:
E.ON Engineering GmbH
Contractor:
Haverkort Voormolen BV
Products used:
HRC T-headed bars